国产免费高清视频

    1. <strike id="qo9nn"><video id="qo9nn"></video></strike><thead id="qo9nn"></thead>
      1. <strike id="qo9nn"></strike>
        <object id="qo9nn"><video id="qo9nn"><acronym id="qo9nn"></acronym></video></object>
          1. <center id="qo9nn"><em id="qo9nn"><track id="qo9nn"></track></em></center>

            Semi-Finished Block Crane

            Equipped in the AAC block autoclaving system, the crane is mainly used to transport the semi-finished blocks with side plates from the cutting line onto the autoclaving cars. Also called grabbing crane, the block handling equipment is ideal for grabbing and transporting mould frame, bottom board, autoclaving car and semi-finished block before and after cutting. In addition, it can also be used for demoulding. Four or six lifting grabs are driven by electric linear actuator to firmly grasp or loosen

            Technical Parameters

            Specification Load (t) Speed (m/min) Lifting stroke (mm) Dimensions (mm)
            4.2 x 1.2 10 20 1350/1700 7700 x 2700 x 2850
            4.8 x 1.2 10 20 1350/1700 8300 x 2700 x 2850
            6.0 x 1.2 15 20 1350/1700 10500 x 2700 x 2850
            国产免费高清视频

            1. <strike id="qo9nn"><video id="qo9nn"></video></strike><thead id="qo9nn"></thead>
              1. <strike id="qo9nn"></strike>
                <object id="qo9nn"><video id="qo9nn"><acronym id="qo9nn"></acronym></video></object>
                  1. <center id="qo9nn"><em id="qo9nn"><track id="qo9nn"></track></em></center>